Complete General Construction Company had been
contracted to replace a bridge over the Muskingum River in
Zanesville. This project required compliance with ODOT and
the Ohio Parks Department. The project involved installation
of a 48" steel pipe that ran through the work site to allow
water flow in the canal (Figure 1). The customer called
FasDam® who met them at he project site and drew a costeffective
system to meet all requirements.
Even with three feet of silt and mud, the asDam® frames held
the head pressure (Figure 2). The system is designed to hold
up to 12 feet of head pressure without any problem.
Figure 1
Figure 2
Contact our staff to determine how FasDam® can help you
with your next project.