Project: Shore Stabilization - Waterloo, Iowa

Installation Date: March 2004


This contractor needed to stabilize a shore
embankment. FasDam® installed 200 feet in
three days, giving the contractor access to
do the repairs. After the contractor is finished, FasDam® pumps the water back and removes the
cofferdam.


Figure 1
FasDam is being installed without heavy equipment.
   
Figure 2 Figure 3
FasDam® placed 60 feet of diversion dam in front of the main dam to help protect it from debris floating downstream. The work area is dry, allowing for construction.
   

 