This contractor needed to stabilize a shore
embankment. FasDam® installed 200 feet in
three days, giving the contractor access to
do the repairs. After the contractor is finished,
FasDam® pumps the water back and removes the
cofferdam.
FasDam is being installed without heavy equipment.
FasDam® placed 60 feet of diversion dam in front of the
main dam to help protect it from debris floating
downstream.